GOLD  $US/OZ $ NYSE:OR  $ TSX:OR    $

SASA (Ag)

Stream and terms:
  •  100% stream on LOM payable silver production

US$5.00/oz Ag transfer payment

Operator: Central Asia Metals

Visit Central Asia Metals for more info

Primary Commodity: Lead, zinc
Location: Kocani, Macedonia
Reserves and Resources: 
  • Probable reserve of 7.67Moz Ag (10.7 million tonnes grading 22.3 g/t Ag.)
  • Indicated resources of 3.32Moz Ag (3.3 million tonnes grading 31.3 g/t Ag.)
  • Infered resources of 4Moz Ag (8.3 million tonnes grading 14.8 g/t Ag.)
Production: Stream Attributable: 4.0k GEOs in full year 2017


A long history of consistent silver production in Macedonia

  • Producing since the mid 60’s
  • Low-cost, lead-zinc mine with stable silver by-product
  • 5 year mine life with potential for extensions
  • First mine in Macedonia to be awarded the IPPC permit (Integrated Pollution Prevention and Control) in 2016
  • Macedonia ranks 10th globally for Ease of Doing Business (World Bank rankings 2017)
Source: Company disclosure and Osisko management estimates.