Royalty and Terms: | 1.5% NSR royalty on copper production, and an 11.5% NSR royalty on silver production at both Highland Copper’s Copperwood (“C”) and White Pine (“WP”) projects. At Osisko’s election, the silver royalty percentage may be increased to 100% on Copperwood and White Pine for a payment of US$23 million. |
Operator: | Visit Highland Copper for more information |
Primary Commodity: | Copper, Silver |
Location: | Michigan, USA |
Reserves and Resources: |
|
Production: |
|
Catalysts (C):
- Early site and detailed engineering works are expected to commence in 2023 as Copperwood is permitted for mine construction
- Project financing and final construction decision
- Subject to completion of financing, the 27-month construction period could begin in Q1 2024
Catalysts (WP):
- Updated Preliminary Economic Assessment expected H2 2023
- Post-PEA, commencement and subsequent completion (in 2025-2026) of Feasbility Study
- Infill drilling for the purposes resource conversion from Inferred to Measured & Indicated
More details in the 2023 Asset Handbook
Source: Company disclosure and Osisko management estimates.